MRW Logo
STAFF | CLIENTS
  • Home
  • About Us
  • Projects
  • Safety
  • Careers
  • Contact Us

Civil

projects

  • Old Goulais Bay No. 31
    Bridge No. 31 Old Goulais Bay Road
    Constructed for the City of Sault Ste. Marie in 2009.
  • Old Goulais Bay No. 9
    Bridge No. 9 Old Goulais Bay Rd
    Constructed for the City of Sault Ste. Marie in 2009.
  • Sussex Road
    Sussex Road Bridge
    Constructed for the City of Sault Ste. Marie in 2009.
  • Carpin Beach Road
    Bridge No. 17 Carpin Beach Road
    Constructed for the City of Sault Ste. Marie in 2009.
  • Third Line
    Third Line Box Culvert
    Constructed for the City of Sault Ste. Marie in 2009.
  • South Market Street
    South Market Street
    200 mm diameter water main installation for the PUC.
  • Trunk Road 1
    Trunk Road 1
    400 mm diameter water main installation for the PUC.
  • Trunk Road 2
    Trunk Road 2
    400 mm diameter water main installation for the PUC.
<< Back to projects
  • Structural
  • Environmental
  • Geotechnical
  • Civil
  • Materials
50 Years Innovative Engineering Solutions

M.R. Wright & Associates Co. Ltd. | 71 Black Road, Unit #8 | Sault Ste. Marie, Ontario | P6B 0A3 | ph. (705) 945-5090
Copyright © 2011. All Rights Reserved.