Civil
projects
-
Old Goulais Bay No. 31
Bridge No. 31 Old Goulais Bay RoadConstructed for the City of Sault Ste. Marie in 2009.
-
Old Goulais Bay No. 9
Bridge No. 9 Old Goulais Bay RdConstructed for the City of Sault Ste. Marie in 2009.
-
Sussex Road
Sussex Road BridgeConstructed for the City of Sault Ste. Marie in 2009.
-
Carpin Beach Road
Bridge No. 17 Carpin Beach RoadConstructed for the City of Sault Ste. Marie in 2009.
-
Third Line
Third Line Box CulvertConstructed for the City of Sault Ste. Marie in 2009.
-
South Market Street
South Market Street200 mm diameter water main installation for the PUC.
-
Trunk Road 1
Trunk Road 1400 mm diameter water main installation for the PUC.
-
Trunk Road 2
Trunk Road 2400 mm diameter water main installation for the PUC.
